Heilig Group received the order to supply a total processing system including seven (7) system air coolers, eleven (11) heat exchanger bundles, thermal oil pumping and monitoring systems, required steel structures and the entire electrical system for power and control.

Within this project the capabilities in performance of the Heilig Group came together, due to many supplies of Geurts, N.M. Heilig, Beemster, and NMH as well. A performance achieved within 6 months from engineering till commissioning.

A big thanks to everyone involved in this project. Great result of team cooperation.

For more information on heat exchangers visit website of our sister company Geurts.